Product Engineering - Quality Management
How To : Use the Standard Task template
The Standard Task setup integrates QM to Manufacturing. (see Concept: Manufacturing Integration)
Field | Description |
---|---|
Standard Task | Select a Standard Task code |
Routing Status | Select a Routing Status |
- [Blank] | |
- Planned | |
- In Progress | |
- Finished | |
The Standard Task will be retrieved from the following table: 83 Item Journal Line | |
Measurement Template | Select a Measurement Template. |
When an Incident, type Material, is created the system starts a search for a Measurement Template and will follow this sequence: | |
1. Standard Task Templates | |
2. Service Item Group Templates | |
3. Item Templates | |
4. Item Category Templates |
See also
Tasks
Reference
Feedback
Submit feedback for