Product Engineering - Quality Management

How To : Use the Standard Task template

The Standard Task setup integrates QM to Manufacturing. (see Concept: Manufacturing Integration)

Field Description
Standard Task Select a Standard Task code
Routing Status Select a Routing Status
- [Blank]
- Planned
- In Progress
- Finished
The Standard Task will be retrieved from the following table: 83 Item Journal Line
Measurement Template Select a Measurement Template.
When an Incident, type Material, is created the system starts a search for a Measurement Template and will follow this sequence:
1. Standard Task Templates
2. Service Item Group Templates
3. Item Templates
4. Item Category Templates

See also

Tasks

Reference