Manufacturing Integration - Cost Resources in Production

When Resources are linked to Capacity Centers the costs of that Capacity Center is assumed to include the resource cost:

  • As part of the Direct Unit Cost, or
  • As part of the Indirect Cost %, or
  • As part of the Overhead Rate

The actual resource time is recorded as a Resource Ledger Entry.

See Also

Return to Resources Integration