Transfer WIP from Production to Project
To track all the details of work related to a ProjectIndustrial Equipment Manufacturing - Manufacturing Integration makes it possible to transfer the WIP entries from a released production order to a Project.
About This walk-through
This walk-through provides an overview of how to setup for the WIP transfer and to process. This walk-through illustrates the following tasks:
- Check Manufacturing Setup.
- Create a production order from a Project.
- Post consumption and output to a production order.
- Change the status of the production order to Finished.
- Monitor the ProjectWIP and post consumption of the finished item
Prerequisites
To complete this walk-through, you will need: • Microsoft Dynamics 365 Business Central. • CRONUS International Ltd. demonstration database. • STAEDEAN IEM RapidStart demo set.
Story
Eduardo is the project planner at CRONUS International Ltd. Eduardo notices from the projectplanning lines a requirement for part no. 1150 and decides to create a production order through Order Planning
Setup
Make sure the "Transfer WIP from Production to Project" setting in Manufacturing Setup is true
- Choose the icon (Alt+Q) enter Manufacturing Setup and click the relevant link.
- Select Manufacturing Solution Setup under the Administration section to open the setup page.
- For IEM-Manufacturing Integration one setting has been added: Transfer WIP from Production to Project.
Process
Create a Production Order
- Open a Project(or create one) and select a Project Task of the type Posting.
- Open the Project Planning Lines
- Add a new line for item 1150 with a quantity of 2
- Release the ProjectPlanning Line
- From the ProjectPlanning Line - Item Planning Menu open Order Planning
- On the Order Planning page select Calculate Plan which should result in a new line for item 1150
- Select the line and click Make Order
- On the Make Supply Orders page make sure the field Make Orders for is set to The Active Order and the Production Order field shows Firm Planned
- Click OK to complete the Make Order process
Post consumption and output to the production order
- From Order Planning return to the ProjectPlanning Page and from the Item Planning menu use Show Replenishment Document.
- In the ProjectRelation List click on the Production Order in the Source Record ID column
- In the View - Prod. Order Line List click on Show Document to open the Firm Planned Production order
- Change the status of the production order to Released and open the released production order
- Verify that components are in inventory by running the Order Planning (Related > Order > Planning)
- If a purchase order has been created, receive the purchase order
- From the production order line open the Production Journal
- Specify setup and run times and mark the operations as Finished
- Post the production journal
When the production journal posting is completed you can verify the production order Work In Process from Related > Order > Entries.
To transfer these entries to the projectFinish the production order
Finish the production order
- In the released production order use the Change Status action to open the pop-up
- Select Finish, leave the other options un changed.
- When completed return to the project
- Open the ProjectLedger Entries and note the new entries for use of components and setup and run time
- Also note that there is no projectledger entry for the finished product since the costs are already recorded as details
- On the projectplanning line you can see that the finished product is in reserved inventory
- Post the projectplanning line to create an Item Ledger Entry type of Negative Adjustment to consume, or deliver the finished product.
See Also
Manufacturing and Service Integration